{"id":29748,"date":"2025-06-02T19:54:57","date_gmt":"2025-06-02T17:54:57","guid":{"rendered":"https:\/\/www.soletanche-bachy.pe\/offer-portfolio\/muros-de-concreto-lanzado\/"},"modified":"2025-07-09T16:49:13","modified_gmt":"2025-07-09T14:49:13","slug":"muros-de-concreto-lanzado","status":"publish","type":"avada_portfolio","link":"https:\/\/www.soletanche-bachy.pe\/en\/offer-portfolio\/muros-de-concreto-lanzado\/","title":{"rendered":"Shotcrete Walls"},"content":{"rendered":"
Shotcrete Walls<\/strong><\/p>\n<\/div> Related projects<\/p><\/h2><\/div>The shotcrete wall is a retaining\/support technique.<\/h2>\n<\/div>
These are structures built by spraying concrete at high pressure onto a surface. They are used for slope stabilization, tunnels, deep excavations, and structural reinforcement, offering fast execution, strong adhesion, and high strength. They can be reinforced with steel fibers, wire mesh, bolts, and\/or anchors to enhance stability.<\/span><\/h3>\n<\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div>
\n\t\t\t\t\t\n\t\t\t\t\t\tSpringsol Mall Cajamarca\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tSlope Stabilization of the R\u00edmac River\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tSoil Mixing \u2013 Lorena Hospital\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tInjections in Starter Dyke and Final Cut-off Wall\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tCut-off Wall for Tailings Dam\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tStabilization of Recuay Hospital\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tPanosol Walls \u2013 La Libertad Hospital\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tBasement \u2013 USIL Insignia Building\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tBasement \u2013 Auna Clinic\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tLines 2-4 Lima Metro\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tSoilmixing IE Fernando Carbajal\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tFoundations for Viaducts L\u00ednea Amarilla Project\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tSpringsol Mall Cajamarca\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tSlope Stabilization of the R\u00edmac River\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tSoil Mixing \u2013 Lorena Hospital\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tInjections in Starter Dyke and Final Cut-off Wall\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>

\n\t\t\t\t\t\n\t\t\t\t\t\tCut-off Wall for Tailings Dam\t\t\t\t\t<\/a>\n\t\t\t\t<\/h4>\n\t\t\t\n\t\t\t\t\t\t\t\t\n\t\t\n\t\t\t\t\t\t<\/a>\n\t<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>